Industry · Glass
Glass-ceramic manufacturer · High energy performance condenser
- 11,600 t CO₂/yr
- 1 year, furnace by furnace
- 561,279,002 kWh cumac

The finding
(TAR) at the end of their life, the heat of three production furnaces entirely lost, and a building with 13 m of ceiling height impossible to heat evenly.
What KELP did
KELP replaced the end-of-life cooling towers with five and two new cooling towers, with helicopter lifts, around ten crane lifts and two rental to keep the furnaces cooled.
The result
Production never stopped.
11,600 t CO₂/yr
CO₂ avoided across the whole site
Equal to the annual carbon footprint of about 1,400 French people, or 82 million km driven every year in a petrol or diesel car

Works funded by energy savings certificates (CEE)