Commercial and public · Healthcare
Hospital buildings · Heat recovery from a water-to-water chiller
- 390 t CO₂/yr
- 1.5 months
- 66,181,500 kWh cumac

The finding
The heat from the four was entirely lost.
What KELP did
First of the site's two operations on a water-to-water chiller: KELP redirected the heat to the networks, using hot taps so that hot water production was never interrupted.
The result
390 t CO₂/yr
CO₂ avoided across the whole site
Equal to the annual carbon footprint of about 48 French people, or 2.8 million km driven every year in a petrol or diesel car

Works funded by energy savings certificates (CEE)


